Construction of 132 kV Double Circuit Overhead Transmission Line from Al Birk to Al Haredha
Strengthening Power Infrastructure Across the Jizan–Asir Region
Supporting reliable power transmission through the construction of a 132 kV Double Circuit Overhead Transmission Line connecting Al Birk and Al Haredha substations.
Connecting Communities Through Reliable Power Infrastructure
Venus Energy constructed a 132 kV Double Circuit Overhead Transmission Line linking the Al Birk and Al Haredha substations in the Jizan–Asir region of Saudi Arabia. Delivered for AlOjaimi over twelve months, the project covered foundations, tower erection and stringing across demanding coastal and mountain terrain.
The line reinforces regional transmission capacity, supporting stable power flow and improved network reliability for communities and industry served by the southern grid.
Project Objectives
Supporting Grid Stability and Network Reliability
Improved Power Flow Stability
A double circuit route that balances load across the regional network.
Enhanced Network Reliability
Redundant circuits reduce interruption risk between substations.
Infrastructure Development
New transmission capacity for growing communities in the south-west.
Long-Term Network Performance
Durable foundations and structures engineered for decades of service.
What We Do
End-to-End Power Infrastructure Solutions
01
Foundation Works
Excavation, reinforcement and casting of tower foundations across mixed soil and hard rock along the route, with open-type foundations adopted where rock conditions demanded it.
02
Tower Erection
Assembly and crane erection of double circuit lattice steel towers, with full alignment, bolt torquing and structural verification at every location.
03
Stringing Works
Tension stringing of conductors and earth wire using controlled pulling equipment, followed by sagging, clipping and accessory installation.
04
Project
Execution
Route survey, material logistics, quality control, HSE supervision and utility coordination through to testing, commissioning support and handover.
Start a Conversation
Planning a Transmission or Distribution Project?
“Hard rock formations affected conventional foundation construction methods, requiring an alternative engineering approach.”
The Venus Solution
Engineering Practical Solutions in the Field
Challenge
Hard rock encountered along the alignment.
Assessment
Geotechnical review at each affected location.
Alternative Foundation Method
Open-type foundations designed for rock strata.
Successful Execution
Programme maintained without rework.
Engineering Practical Solutions in the Field
An alternative foundation method adopted in rock strata, keeping construction safe, efficient and on programme.
The Venus Solution
Project Impact
Delivering Infrastructure That Supports Growth
Enhanced Grid Connectivity
A firm 132 kV link between the Al Birk and Al Haredha substations.
Improved Power Flow Stability
Steadier transmission across the Jizan–Asir corridor.
Infrastructure Development
Capacity to support residential, industrial and utility growth.
Long-Term Network Reliability
Assets built to perform through demanding terrain and climate.
Supporting Critical Infrastructure Across the Kingdom
Reliable transmission is the foundation of national growth, industry and everyday life.
Projects such as the Al Birk to Al Haredha line extend the reach and resilience of the national grid, aligning with the Kingdom’s long-term infrastructure ambitions and the energy needs of a growing population.