Powering Industrial Infrastructure with Precision and Reliability
Venus Energy successfully executed the 110 kV double-circuit transmission line conductor stringing project for Umm Al-Qura Cement Factory, in collaboration with Alfanar Projects.
The project involved precision-driven conductor stringing works, with a strong focus on execution quality, operational safety and reliable power transmission.